Analisis Pengendalian Jadwal dan Biaya Proyek dengan Metode Earned Value
(1) Universitas Sembilanbelas November Kolaka
(2) Universitas Sembilanbelas November Kolaka
(3) Universitas Sembilanbelas November Kolaka
(4) Universitas Sembilanbelas November Kolaka
(5) Universitas Sembilanbelas November Kolaka
(*) Corresponding Author
Abstract
As is known in a project must have complex problems such as delays. Therefore in a construction project it is necessary to have control (project management). One method of controlling costs and time as well as presenting activity achievements is the Earned Value method. The Earned Value method is a method used to analyze implementation performance and make forecasts for completion of projects that provide information on project performance in a reporting period. This study aims to determine the estimated difference between costs and the estimated difference in the schedule for completion of project work. The research method used is a descriptive method of analysis carried out by describing with the intention of finding elements, analysis and even comparison. The object of this research is the Boepinang – Bambaea Road Preservation Project in Bombana Regency, Southeast Sulawesi Province. The research results show that in the 46th week the BCWS value is Rp. 77,756,229,619.32, BCWP of Rp. 57,253,721,235.07, and ACWP of Rp. 54,018,446,122.17. The value of the Cost Performance Index (CPI) = 1.06 > 1 indicates that the actual cost incurred is less than the value of the work done or the project is profitable. Time Performance Index (SPI) value of 0.74 < 1 indicates the project is slower than the planned schedule. The final project completion cost (EAC) is Rp. 130,071,487,094.59 smaller than the planned budget. The budget difference value (VAC) between plan and implementation is Rp. 3,235,275,130.90.
Keywords
Full Text:
PDFReferences
Ahmad Azrul Azwar. (2021). Analisis Pengendalian Biaya Dan Waktu Menggunakan Metode Earned Value Concept Dan Earned Schedule (Studi Kasus Proyek Pembangunan Bendungan Sukamahi).
Abdul Muhyi.(2022).Pengendalian Biaya Dan Waktu Proyek Dengan Menggunakan Metode Earned Value (Studi Kasus Proyek Pelaksanaan Preservasi Jalan Nasional Wilayah Ii Provinsi Aceh,Jalan Batas. Aceh Selatan/Subulussalam – Batas. Provinsi Sumut)
Badan Pusat Statistik (BPS), Kecamatan Poleang Selatan dalam Angka 2022, BPS Kabupaten Bombana.
Dipohusodo, Istimawan. (1996). Manajemen Proyek dan Konstruksi Jilid 2. Kanisius, Yogyakarta.
Ervianto, W. I. ,2005. Manajemen Proyek Konstruksi, Andi, Yogyakarta.
Hartono, Widi dan D. Suharto (2007). “Earned Value Method Untuk Pengendalian Biaya Dan Waktu (Studi Kasus Proyek Pembangunan Gedung Balai kota Surakarta)”. Jurnal Teknik Sipil, Fakultas Teknik UNS Surakarta, Nomer 1,Surakarta, Januari 2007, Halaman 1-11.
Khrisna Agatha, Drs. Hasan Dani, MT. Pengendalian Biaya dan Jadwal Proyek dengan Menggunakan Nilai Hasil (Proyek Rehabilitasi Gedung X Gresik). Jurnal Mahasiswa Uiversitas Negeri Surabaya.
Lubis, Ibrahim. (1985). Pengendalian dan Pengawasan Proyek Dalam Manajemen. Cetakan Pertama. Ghalia Indonesia, Jakarta.
Mei Brilian Harefa. (2021). Pengendalian Pelaksanaan Pada Proyek Jalan Dengan Earned Value Analysis Nusantara, B. (2003). Evaluasi Kinerja Biaya dan Waktu dengan Menggunakan Konsep Nilai Hasil, Laporan Tugas Akhir, Jurusan Teknik Sipil Universitas Islam Indonesia, Yogyakarta.
Article Metrics
Abstract view : 121 timesPDF - 17 times
Refbacks
- There are currently no refbacks.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PUBLISHED BY :
Program Studi Teknik Sipil,
Fakultas Sains dan Teknologi,
Universitas Sembilanbelas November Kolaka
Gedung Fakultas Sains dan Teknologi Lantai 3,
Desa Popalia, Kabupaten Kolaka, Provinsi Sulawesi Tenggara, 93517
e-mail : tekniksipil_fst@usn.ac.id
e-ISSN : 3047-518X
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
All publications by Scale Journal of Civil Engineering.
This work is licensed under a Creative Commons Attribution 4.0 International License.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------